ElyxAI

Excel for a quantity surveyor: which item was measured over the estimate

The quantity surveyor workbook on this page is the list you open before the morning read of the takeoff. One row is one work item. You type the item, the trade, the unit, the estimated quantity, the measured quantity, and the unit rate. The gap is measured minus estimated while the row is still open. The window says over when that gap is above zero, short when it is below zero, and match when the two quantities are equal. The amount is measured times the rate you typed. This file is not a daily site log. That log answers which task percent you typed for the day. This list answers which item was measured above the estimate. It is not a routing sheet of minutes, and it is not an event budget. You type both quantities. The sheet does not invent a measure. The guide below builds that takeoff. Elyx writes the gap, the amount, and the window in the workbook you already keep. You still type the estimate, the measure, and the rate. The trial lasts 7 days, with no card.

1 workflows

Frequently asked questions

What goes on a quantity takeoff?

One row per item: estimated quantity, measured quantity, and a window of over, short, or match.

Is this the daily site log?

No. A site log uses a date and a percent. This sheet uses the two quantities you typed.

Does the sheet decide the measure?

No. You type the estimate and the measured quantity. The gap is only the difference of those two cells.

Essential
Popular